Log in

Outputs / Ressources

Final Report

Baltic InteGrid: towards a meshed offshore grid in the Baltic Sea

 

      

 

The final report "Baltic InteGrid: towards a meshed offshore grid in the Baltic Sea" is laying out the key findings of the project at length, which can be further studied in even more depth in the underlying reports from the different thematic working groups of Baltic InteGrid below.

The report includes a visionary roadmap towards an integrated offshore energy grid in the Baltic Sea (Baltic Offshore Grid - BOG 2050).

Besides the full report, there is also an abridged version in the form of a 24-page "Summary Report" of the findings (for print outs, use A3 format for best display of pages), if you are short on time and prefer a brief overview.

PreFeasibility Case Studies

Towards a Baltic Offshore Grid: Connecting electricity markets through offshore wind farm (PreFeasibility Case Studies)

 

 

The report "Towards a Baltic Offshore Grid: Connecting electricity markets through offshore wind farms" is laying out the step-by-step analysis of the two PreFeasibility Case Studies of the Baltic InteGrid project with different built-out and integration scenarios of interconnecters and OWE farms between Poland-Sweden-Lithuania (Case Study 1) and Germany-Sweden (Case Study 2)

Outputs of the Thematic Working Group Environment & Society (3.4)

Outputs of the Thematic Working Group Cost-Benefit Analysis (3.6)

Recommendations to the Ten Year Network Development Plan (TYNDP)

Summary of the Baltic InteGrid consortium's recommendations submitted to the public consultation of the ENTSO-E’s Ten Year Network Development Plan 2018 (TYND2018)

Recommendations for the Maritime Spatial Planning Process

The Baltic InteGrid recommendations for the Maritime Spatial Planning Process.

Recommendations for Policy & Regulation

The Baltic InteGrid recommendations for an efficient policy & regulatory framework.

First Results Conference (16 May 2017, Riga)

Documentation of the First Results Conference "Towards a Meshed Grid: Offshore Wind Energy and Interconnectors in the Baltic Sea Region" of the Baltic InteGrid project in Riga (Latvia) on 16 May 2017

BOGF Key Event: PreFeasibility Studies Conference Presentations (7 June 2018, Warsaw)

Country Workshop Finnland on 15 May 2018, Espoo

Baltic InteGrid Project Newsletters

The Baltic InteGrid project has published a number of newsletters with interesting insights into offshore wind energy developments in the Baltic Sea region. Find the different issues of the newsletters below.

1st edition of the Baltic InteGrid newsletter.

Click here to read the 2nd edition of the Baltic InteGrid newsletter.

Click here to read the 3rd edition of the Baltic InteGrid newsletter.

Click here to read the 4th edition of the Baltic InteGrid newsletter.

Click here to read the 5th edition of the Baltic InteGrid newsletter.